Q: According to the fundamentals of ‘method-time measurement’, the standard time of an operation includes some fatigue allowance when the machine is loaded / unloaded manually by an operator.
Should I consider this standard time as theoretical maximum speed? Or should I eliminate the fatigue allowance from the standard time to find the theoretical maximum speed?
Arno Koch • By definition, OEE identifies and visualizes ALL potential EQUIPMENT losses; so also the time the equipment has to wait for the loading/unloading. This might be a subject for an improvement activity.
OEE measures against THEORETICAL maximum speed, not ‘CURRENTLY assumed to be the best possible’.
Hint: When your OEE drops down due to difficult loading and unloading, causing operators to become fatigue; then improve the loading and unloading instead of hiding this by taking it out of the OEE!
See also:
Answer still not found?
To help you best, please be as specific as possible and please understand:
We do not want to reply to anonymous questions.